Skip to main content
#Title
26Investigations into the status of fisheries, biological and water quality in the River Pelenna catchment, prior to the treatment of discharges from abandoned coal mines : PL/EAW/95/3
27Enhancement of spring salmon- Proceedings of a one-day conference held in the Rooms of the Linnean Society of London
28Water quality objectives: procedures used by the NRA for the purpose of surface waters river ecosystem) (classification) regulations 1994
29An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge
30River Habitat Quality the physical character of rivers and streams in the UK and Isle of Man
31Interim report on the environmental impacts of the drought on Yorkshire rivers April 1995 to April 1996
32The effects of fishing at low water levels
33First annual review of the River Exe catchment management plan
34Non-compliance of the Bidwell Brook with river quality objectives
35Hampshire and the Isle of Wight local contribution 2006/11
36Non-compliance with water quality objectives on the Croyde stream (upper catchment)
37Review of fishery regulations on the Rivers Taw and Torridge
38The Wandle, Beverley Brook, Hogsmill catchment management plan : action plan : July 1995
39Fish Guide 1997/98 A Guide to day ticket fisheries in the Midlands
40Identification of water quality problems in the Strat and Neet catchments
41The Wandle, Beverley Brook, Hogsmill catchment management plan : consultation report : November 1994
42The Warwickshire Avon catchment management plan : final plan : October 1994
43The quality of rivers in England and Wales (1990 to 1995)
44The Blackwater River catchment management plan : first annual review 95/96 : Draft Document
45Statement on public consultation for the Dove CMP : July 1995
46Distribution of Azolla in the Great Ouse catchment
47River water quality in the Midlands 1994/95 : water quality summary data
48First annual review of the River Taw catchment management plan (1996)
49Guidelines for river corridor surveys in the NRA : February 1992. draft 3
50First annual review of the River Tone catchment management plan