Skip to main content
#Title
1101Effectiveness of eutrophication control by phosphorus reduction: development of the INCA-P model
1102An evaluation of discharge and consent compliance policy : a blueprint for the future
1103An evaluation of discharge and consent compliance policy : a blueprint for the future : letters from respondents
1104Definition of terms used in the assessment information management system (AIMS) : guidance note 5
1105Time of travel study on the River Wandle under two different flow conditions
1106The Natural (Baseline) Quality of Groundwaters in England and Wales - Magnesium Limestone of Yorkshire and Northumbria
1107Biological river quality 1995 according to the general quality (GQA) scheme [map] : scale 1 : 750 000
1108Desktop study of methods for the monitoring of particulate emissions from positively pressurised baghouses
1109Lower Lee fish mortalities associated with rainfall : including the event of 7/8th September 1993
1110Integrated river corridor assessment : a pilot study of the rivers Wansbeck and North Tyne in Northumbria
1111River Teign corridor survey : prepared by Ecologue for the National Rivers Authority (South West Region)
1112Scope for growth and levels of contaminants in mussels from the Wash. Phase 2
1113River Stort : draft catchment management plan for flood defence and the environment : May 1991
1114Catchment management plans : protecting and enhancing the water environment in an integrated manner
1115Impact assessment of scour valve test at Roadford Reservoir on water quality of the River Lyd
1116Recorded rainfall data from Rain Gauge 6 in the Wensum Catchment between 2010-2015
1117Recorded rainfall data from Rain Gauge 3 in the Wensum Catchment between 2010-2015
1118Recorded rainfall data from Rain Gauge 5 in the Wensum Catchment between 2010-2015
1119Recorded rainfall data from Rain Gauge 1 in the Wensum Catchment between 2010-2015
1120Recorded rainfall data from Rain Gauge 4 in the Wensum Catchment between 2010-2015
1121Recorded rainfall data from Rain Gauge 2 in the Wensum Catchment between 2010-2015
1122Notice to water only companies of programme of environmental obligations agreed by the Secretary of State for the Environment, Transport and the Regions and for Wales : periodic review of water company price limits 2000-2005
1123A review of the hydrogeological information for the Thompson and Merton areas, Norfolk : including predictions of the impact of nearby chalk water abstractions on water levels at Thompson Water, Carr and Common SSSI and candidate SAC
1124Correspondence Relating to the Seismic Surveys of Lake District Water Bodies undertaken by Prof. Gerald Sargent in 1983 and 1987
1125The Effect of N Fertiliser forms on nitrous oxide emissions from UK arable and grassland. Defra project number NT2605