Skip to main content
#Title
1201YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk A in 2011
1202Notice to water only companies of programme of environmental obligations agreed by the Secretary of State for the Environment, Transport and the Regions and for Wales : periodic review of water company price limits 2000-2005
1203A review of the hydrogeological information for the Thompson and Merton areas, Norfolk : including predictions of the impact of nearby chalk water abstractions on water levels at Thompson Water, Carr and Common SSSI and candidate SAC
1204Correspondence Relating to the Seismic Surveys of Lake District Water Bodies undertaken by Prof. Gerald Sargent in 1983 and 1987
1205The Effect of N Fertiliser forms on nitrous oxide emissions from UK arable and grassland. Defra project number NT2605
1206The Effect of N Fertiliser forms on N2O emissions from UK arable and grassland. Experimental site in Norfolk, 2004
1207The Effect of N Fertiliser forms on N2O emissions from UK arable and grassland. Experimental site in Devon, 2004
1208Groundwater pollution : evaluation of the extent and character of groundwater pollution from point sources in England and Wales
1209Analysis of natural and polluted river communities in Great Britain- Progress report for the period April 1984- March 1988
1210Water quality modelling in the Environment Agency (Report no.28) : present practice and future challenges : Water Quality Modelling Group workshop proceedings
1211Analytical method for the determination of acid herbicides in sandstone and chalk aquifer materials (Draft RanD note) P439/9/A
1212The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : study of natural wetlands
1213Report for Welsh Region on selected flood defence schemes and the development of a standard methodology for risk assessment
1214Front Cover of A Key to the British Species of Freshwater Cladocera, with Notes on their Ecology
1215Report on US study tour of engineered wetlands for the treatment of waste water and mine drainage, March 1992
1216Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality
1217The FBA-Welsh Water simulation model of phytoplankton dynamics in flushed systems. Authentication in a coastal lagoon
1218Freshwater migration of sea trout (Salmo trutta L.) in the river Tywi during 1988, 1989 and 1990
1219Investigating the effect of changing retention time in natural and artificial water bodies: Simulations using PROTECH-D
1220NRA Thames region : audit surveys 1991/92 : a report on the re-surveys of selected reaches of river following maintenance dredging
1221Progress in water supply planning : the Environment Agency's review of water company water resources plans : a submission to Government
1222Database and atlas of aquatic vascular plants in the British Isles : part 2 : distribution maps (352/2/N and Y)
1223Proposed decision for the future regulation of disposals of radioactive waste from British Nuclear fuels plc Sellafield : supporting information
1224Development of data and information sources on Natura 2000 estuarine sites in the north west : Morecambe Bay : final report
1225An overview of the IBP compound when building was finished (generator located in disused house in front).