301 | Pesticide residues in fish taken from the Newlyn River (1992) |
302 | Environmental statement for the River Wandle flood alleviation scheme contract one (C1) |
303 | Investigation of salinity in the river Thurne catchment of North East Norfolk |
304 | Water quality investigations in the Newlyn river catchment |
305 | The River Alt/Crossens fish stock assessment 2001 |
306 | An assessment of water quality in the River Yarty catchment |
307 | Investigations of discharges into the River Lemon at Newton Abbot |
308 | The Ely Ouse catchment management plan : final plan : January 1994 |
309 | Investigating the Applicability of Passive Sampling Devices to Pesticide Monitoring |
310 | Water quality in Anglian Region : the first five years |
311 | Monitoring of the Priory storm overflow on the River Tone at Taunton : June - November 1991 and water quality investigations unit January 1992 |
312 | Water Quality and Freshwater Flow in the Thames Tideway in Relation to Salmon Migration, with particular reference to the effects of low flow in 1990 |
313 | Wimbleball pumped storage scheme : review of environmental statement (appendix B3) : implications for water quality in Wimbleball Reservoir, the River Exe (non QUASAR) parameters) and the Exe estuary |
314 | Report for Anglian Water, plc on the use of the Orwell Estuary mathematical model to derive long term consent limits for Cliff Quay STW |
315 | An investigation to determine if South Molton STW is the cause of elevated copper and zinc concentrations downstream in the River Mole [DEV/E/18/95] |
316 | River Glen : river channel assessment : annex A a report of the nature, availability and extent of data and information relating to the River Glen and its catchment |
317 | Eutrophication in controlled waters in the Warwickshire Avon catchment (final report). Vol 2 : appendices |
318 | Best Available Techniques For The Control Of Pollution In Inorganic Chemical Processes - Appendix |
319 | Trevone Bay beach EC bathing water guideline non-compliance : investigation into the Trevone Stream : final report |
320 | Planning application for the proposed Maidenhead, Windsor and Eton flood alleviation scheme January 1991 |
321 | Hope Cove : non-compliance in 1998 with the European Community bathing water directive (76/160/EEC) |
322 | Investigation into the storm overflow discharge regime of Hill Barton Seawage Treatment Works Okehampton |
323 | Mercury and methylmercury in the river Yare, Norfolk (1986 - 1992) : executive summary (OI/420/9/A) |
324 | Research and development 2000 : a strategy for the research and development support service : version 2 |
325 | The impact of climate change on severe droughts: River-flow reconstructions and implied groundwater levels |