Skip to main content
#Title
1101Effectiveness of eutrophication control by phosphorus reduction: development of the INCA-P model
1102An investigation of the Madford River pollution incident of 29 July 1989 : November 1989
1103Devon area internal report - measurement of dissolved oxygen levels in the Dart estuary - March 1996
1104The evaluation of a pHOX model 962 hand-held dissolved oxygen meter (220/28/T)
1105The evaluation of a WTW model OXI 196 hand-held dissolved oxygen meter (220/29/T)
1106The evaluation of a YSI model 58 hand-held dissolved oxygen meter (220/24/T)
1107The evaluation of an ABB Kent-Taylor model 7135 hand-held dissolved oxygen meter (220/30/T)
1108An evaluation of discharge and consent compliance policy : a blueprint for the future
1109An evaluation of discharge and consent compliance policy : a blueprint for the future : letters from respondents
1110Definition of terms used in the assessment information management system (AIMS) : guidance note 5
1111Monitoring the effects of a combined sewer overflow discharge to a small watercourse in South Wales
1112The Natural (Baseline) Quality of Groundwaters in England and Wales - Magnesium Limestone of Yorkshire and Northumbria
1113Biological river quality 1995 according to the general quality (GQA) scheme [map] : scale 1 : 750 000
1114Analysis of bacteriological contamination and accumulation of metals and organics in the mussel (Mytilus edulis)
1115Desktop study of methods for the monitoring of particulate emissions from positively pressurised baghouses
1116Lower Lee fish mortalities associated with rainfall : including the event of 7/8th September 1993
1117Integrated river corridor assessment : a pilot study of the rivers Wansbeck and North Tyne in Northumbria
1118River Teign corridor survey : prepared by Ecologue for the National Rivers Authority (South West Region)
1119Water pollution incidents in England and Wales - 1993 : report of the National Rivers Authority
1120Scope for growth and levels of contaminants in mussels from the Wash. Phase 2
1121River Stort : draft catchment management plan for flood defence and the environment : May 1991
1122Impact assessment of scour valve test at Roadford Reservoir on water quality of the River Lyd
1123YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk B in 2012
1124YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk C in 2011
1125YSI, turbidity and stage data for the Wensum Demonstration Test Catchment's monitoring kiosk B in 2013