Skip to main content
#Title
1251Water quality modelling in the Environment Agency (Report no.28) : present practice and future challenges : Water Quality Modelling Group workshop proceedings
1252Addendum to the Stanmoor bank feasibility study and appraisal report : Lower Tone flood defence improvements : phase II
1253Local Environment Agency plan for the West Midlands Tame, 2nd annual review, July 2001 : local environment focus
1254Analytical method for the determination of acid herbicides in sandstone and chalk aquifer materials (Draft RanD note) P439/9/A
1255Summary report on blue-green algae toxin analysis, Toxicity Assessment and reporting to the Environment Agency, 1998
1256The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : review of existing literature
1257An investigation into possible causes of poor water quality at Nymphayes Bridge (R30D009) on the Gissage Lake
1258The protection of East Anglian wetlands Phase 2 : review of BGS draft report. February 1995 (OI 558)
1259The use of constructed wetlands to ameliorate metal-rich mine waters. Stage 1 : study of natural wetlands
1260Report for Welsh Region on selected flood defence schemes and the development of a standard methodology for risk assessment
1261Possible replacements for the biochemical oxygen demand (BOD) test and suspended solids as measures of effluent and water quality
1262Strategic Land Use Planning In Europe And Usa: Review Of Best Practice For The Environment Agency (Vol 1 Overview And Recommendations)
1263River Lemon corridor survey : a report prepared by Ecologue for the National Rivers Authority (South West Region)
1264Front Cover of A Key to the British Species of Freshwater Cladocera, with Notes on their Ecology
1265Report on US study tour of engineered wetlands for the treatment of waste water and mine drainage, March 1992
1266NRA guidance on the acceptable leachable values for contaminated material to be deposited in Upper Tame catchment
1267Scoping Study For Collaborative R and D Between The Environment Agency And L'agence De L'eau Seine Normandie
1268Graphical representation of certain metals and organics concentrations versus flow rates for some of the rivers in Districts 3 and 6
1269Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality
1270A review of the industrial uses of continuous monitoring systems : incineration processes : a report produced for NCCA and ETSU by Entec
1271The Blythe/Cole/Bourne catchment management plan : first annual review : July 1994 to July 1995 (NRA Severn-Trent 48)
1272Eutrophication in controlled waters in the Warwickshire Avon catchment (final report). Vol 1 : report and executive summary
1273Manor Wall and Landguard Fort sea defences, Felixstowe : part of the Southern Felixstowe coastal strategy option selection scoping consultation document
1274Letter of confirmation of geophysical surveys made in conjunction between Professor G.E.G. Sargent and the FBA 1983-1987
1275The FBA-Welsh Water simulation model of phytoplankton dynamics in flushed systems. Authentication in a coastal lagoon