Skip to main content
#Title
26Stratification in the Severn Estuary- Physical aspects and biological consequences
27The Mersey estuary : a report on environmental quality
28Suffolk estuarine strategies : Deben estuary strategy : introduction to the strategy
29Suffolk estuarine strategies : Alde and Ore estuary strategy : introduction to the strategy
30River Axe Fish Study - Evaluation of Fish Movements in the Estuary
31First annual review of the Taw/Torridge estuary catchment management plan (1996)
32Metallothionein in eels from the Thames Estuary : an indicator of environmental quality
33Impact of reservoir construction construction on the Bruckland Stream
34Our vision for the Thames Gateway : a showcase for sustainable development
35An interim report on the coastwatch bioaccumulation programme : metals
36Second annual review of the Taw / Torridge Estuary catchment management plan
37The Mersey Estuary 1992 surveys : summary of results
38The River Colne Estuary subtidal biological survey 1992
39Summary of monitoring activities on the blackwater estuary
40Medway Estuary fisheries survey 2000 : (incorporating the report for 1997 to 2000)
41A survey of trace metals in biota of the Mersey estuary 1993
42Eel and elver studies in the Severn : interim report (256/6/ST)
43Report on monitoring of environmental quality in the Severn Estuary
44Water quality in Anglian Region : the first five years
45Report for Anglian Water, plc on the use of the Orwell Estuary mathematical model to derive long term consent limits for Cliff Quay STW
46Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/01- May 1998
47Report for Anglian Water, NRA Unit on the inclusion of storm water overflows into the Orwell Estuary model, and its use to predict limits for SWO discharges
48National marine baseline survey 1995 : littoral cell 7 : Lands End to the Severn Estuary
49National marine baseline survey 1995 : littoral cell 4 : the Thames to Selsey Bill
50Devon area internal report - further investigations into pipe discharges in the Lower Teign estuary