Skip to main content
#Title
1201The application and validation of in situ ecotoxicological assays at biologically and chemically incongruous sites (379/2/T)
1202A report on a baseline survey of the subtidal benthic communities within Portland Harbour (January 1997)
1203The available resource methodology : a framework for assessing water resources and abstraction availability : final report
1204Controlling the inputs of persistent chemical to marine waters from land-based sources
1205An environmental assessment of mercury in mussels (Mytilus edulis L.) in the Mersey Estuary : final report
1206The Impact Of Discarded Fishing Line And Tackle On Mute Swans - Phase 1
1207Heavy metal contaminants in fish caught from the Mersey Estuary and inshore Liverpool Bay
1208A review of the industrial uses of continuous monitoring systems : minerals industry processes
1209Herbicides for use in or near the aquatic environment: Priorities for Environmental Quality Standards Development
1210Manual for the use of herbicides in or near water : April 1993 : final draft report
1211Direct toxicity assessment : a step towards better environmental protection within the UK : business strategy
1212Pesticides 2000 : a summary of monitoring of the aquatic environment in England and Wales
1213Analysis of airborne platform specifications and operations for the National Rivers Authority by Atlantique Reconnaissance Ltd
1214An investigation of the Madford River pollution incident of 29 July 1989 : November 1989
1215Devon area internal report - measurement of dissolved oxygen levels in the Dart estuary - March 1996
1216The evaluation of a pHOX model 962 hand-held dissolved oxygen meter (220/28/T)
1217The evaluation of a WTW model OXI 196 hand-held dissolved oxygen meter (220/29/T)
1218The evaluation of a YSI model 58 hand-held dissolved oxygen meter (220/24/T)
1219The evaluation of an ABB Kent-Taylor model 7135 hand-held dissolved oxygen meter (220/30/T)
1220An evaluation of discharge and consent compliance policy : a blueprint for the future
1221An evaluation of discharge and consent compliance policy : a blueprint for the future : letters from respondents
1222Definition of terms used in the assessment information management system (AIMS) : guidance note 5
1223Monitoring the effects of a combined sewer overflow discharge to a small watercourse in South Wales
1224Time of travel study on the River Wandle under two different flow conditions
1225The Natural (Baseline) Quality of Groundwaters in England and Wales - Magnesium Limestone of Yorkshire and Northumbria